Lean accounting, taken time, day–by–the–hour, FTT Sturdy Toy Company manufactures toy trucks. Orders for 9,400
produced simultaneously in 10 manufacturing cells. Time available for production in each cell is 7 hours per day for
21 days during March.
REQUIRED
:
• A. Calculate the taken time.
• B. At the end of the first hour of a day’s production, one cell had completed 5 good trucks, including one truck
that was reworked.
• 1. Calculate the day–by–the–hour results and the variance.
• 2. Calculate the first time through (FTT) rate.