Horizontal control
Using a Total station, the horizontal angular measurement of some identified target points are required to be taken from specific station positions within the K-block site (Refer to practical survey Risk Assessment in Appendix 4). a) Record the horizontal circle readings for the target points in the booking sheet shown in Appendix 3. b) Determine the mean horizontal circle readings for the identified target points from your allocated instrument position. c) Evaluate the mean horizontal angles for the target points. d) Describe with annotated sketches the process you obtained the horizontal angular measurements on-site using a Total Station from your allocated instrument position. |
Submission requirements: |
1. All calculations should be well presented in terms of language, explanation of each stage of the work, style and layout. 2. Submission should be in a single report format showing the following § Cover page, § List of Contents page § Page numbers § Headers and Footers (if applicable) § Text should be Font Size – 12 for main body of text § Text should be justified § Referenced using the Harvard System of Citing References § Each task clearly identified in the following order Introduction, Part 1 – Vertical control, Part 2 – Horizontal control and Conclusion |